Dreaming of a beautiful backyard with a sparkling pool to dive into on hot summer days? Picture this: a sun-soaked afternoon, laughter echoing off the water, and the refreshing embrace of your pool. Living in Florida, where sunshine is a constant companion, the idea of having a pool isn’t just a luxury; it’s a daily escape into joy.

If you’re wondering how long it takes to turn that dream into reality, you’re in the right place. Building a pool involves several steps, each taking its own time. Let’s dive into the details so you can plan your pool construction in the best way possible.

How Much Time Do You Need For Swimming Pool Construction?

Below is the general idea of how long pool contractors take to build and design the perfect retreat for your residential or commercial space.

● Design – 1 to 4 Weeks:

The first step in building your dream pool is the design phase. It is where you envision your pool’s shape, size, and features. Collaborating with a professional company typically takes 1 to 4 weeks, ensuring every detail aligns with your vision.

● Permitting – 2 to 6 Weeks:

Before breaking ground, necessary permits must be obtained. The time frame for this varies based on your location, but on average, it takes 2 to 6 weeks to navigate through the permitting process for new pool construction.

● Excavation – 1 Week:

Once permits are in hand, excavation begins. This step involves digging the pool shape into your backyard, which usually takes around 1 week.

● Steel, Plumbing, Electrical – 1 to 2 Weeks:

The foundation of your pool is constructed with steel, followed by plumbing and electrical work. This stage generally takes 1 to 2 weeks to ensure everything is set up correctly.

● Gunite, Plastering, Vinyl, Fiberglass – 1 to 3 Weeks:

The pool structure is then built using materials like gunite, plastering, vinyl, or fiberglass. The time frame varies based on your chosen materials, ranging from 1 to 3 weeks.

● Deck, Landscaping, Custom Features – 1 to 4 Weeks:

The finishing touches include decking, landscaping, and any custom features you desire, which can take around 1 to 4 weeks. This stage adds aesthetic appeal and personalization to your pool area.

Total Time to Build a Pool: 8 to 12 Weeks on Average:

Considering all the stages involved, the average time to complete a new pool construction project is 8 to 12 weeks. However, keep in mind that individual circumstances and unexpected challenges may influence the timeline.

The unpredictability of weather may cause temporary pauses in construction, especially in outdoor projects. Similarly, intricate features or a larger pool size can extend the project’s duration.

Choose Swimming Pools Of Florida For Your New Pool Construction

When it comes to bringing your pool dreams to life, trust the experts at Swimming Pools of Florida. With a reputation for excellence in swimming pools construction, we offer a seamless and efficient process from design to completion. Our skilled team ensures quality craftsmanship, timely delivery, and a pool that exceeds your expectations.